millar header
project1
project1
baggage handling

Project Management

Re-organisation of passenger security areas at Heathrow Airport

Key Benefits

25% additional space from reorganisation of layout

New queuing systems

Additional X-ray machines

 

Project Description

Following major changes in security requirements, it was quickly recognised that the security areas at Heathrow airport had insufficient space and operational capacity to cope with the increased demands.

Millar Management reviewed the security layout, process organisation and space utilisation at  each terminal of the aiport.

Since the airport operates continually throughout the day,  any planned re-organisation had to take place whilst the security areas were in use by passengers.

Solution

The layout of each security area was designed to meet the actual process flow of the security requirements. Unused space was eliminated.

Millar Management Project Managed the improvements at Terminal 4.

Space was increased by extending into the airport retail area. Additional security lanes were installed with extended queuing mazes. The rollerbeds of the X-ray machines were modified to improve the passenger preparation area. Additional X-ray machines were installed to increase throughput capacity.   

Outcome

The space and operational capacity of the security area at T4 was increased by 25%.

The changes increased the area available for passenger preparation and increased the rate of passenger throughput.

The re-organisation was successfully completed whilst ensuring the area remained available for use by passengers.

09/09/2007 - Millar Management awarded new £4M contract
Millar Management have been appointed Project Manager of £4M project to improve passenger facilities at T1, T3 and T4 at Heathrow airport.
02/09/2007 - Redesign of baggage system at major airport in Far East
Millar Management have announced the completion of the scheme design of the baggage system at one of the busiest airports in the Far East. The baggage system has been redesigned to allow for the major increase in traffic volumes being experienced at the airport.
14/07/2007 - Millar Management completes re-organisation of passenger security at T4
The re-organisation of the security area at T4 has been successfully completed.