Terminal 3 Integrated Baggage Facility

projectdescription

Terminal 3 Capacity Phase 4 – Provide an upgraded baggage facility with integrated transfer baggage (Single Build Location).

value

Est. Value £237m – Est Programme 2 years.

role

Provision of Data Modelling, Options and Concept Design Design/Project Management through early design stages.

commentary

MM were engaged to provide options for the integration of baggage facilities at Heathrow Terminal 3 bringing transfer and direct baggage into a single location.

Using Heathrow projected schedules MM carried out baggage modelling and designed a number of Options using the existing baggage envelope.

Whilst working on another project within the terminal, MM identified the need for additional passenger space and generated options for relocating the baggage facility to the site of the existing transfer bag facility leaving the baggage hall for terminal expansion.

Further Options were generated and the project was then passed to a number of HAL contractors for completion.